Mr. Angel Telles
01/1963 | Las Cruces, NM
PROGRAMS:
COMPANIES:
LOCATIONS:
Downey, CA; Cape Canaveral, FL; Kennedy Space Center, FL
POSITIONS:
Logistics Analyst, Logistics Engineer, Project Leader III
COMMENTS:
Managed technically complex systems for Avionics Guidance, Navigation & Control, Communications, Displays & Control, and Instrumentation.
• Logistics lead for implementation of MEDS (Glass cockpit) sustainment engineering and support.
• Simultaneously coordinated and completed 20+ multiple projects for development and operations per year. Interfaced extensively with multiple levels of management, suppliers, organizations and customers.
Project Leader responsible for technical, cost, schedule and performance metrics, for hardware development, manufacture, logistics, and support ranging from $50,000 to $65 Million for Space Shuttle Program. Projects included Orion capsule and Ares rocket design.
Hired in Downey, CA after Challenger Accident for STS-26R. Then transferred to Rockwell SSD Florida in January 1990 through September 1996. October 1996 transition over to United Space Alliance through completion on July 22, 2011 after 24 years on Space Shuttle Program and worked on 110 STS missions (STS-26R through STS-135).