John E. Van Sickle
Dexter, Michigan
PROGRAMS:
COMPANIES:
LOCATIONS:
Patrick AFB, FL
Warner Robbins AFB, GA
Cape Canaveral AFS, FL
Kennedy Space Center, FL
POSITIONS:
Pad Electrician
Communication Technician
Industrial Controls
Electrical Engineer
COMMENTS:
Electrician Patrick AFB, CCCAFS and KSC – 1982 to 1992 Greer Electric Co. Rockledge – Electrical Contractor supporting KSC Shuttle Infrastructure. Performed prime contracted 39 A & B Pad Shuttle Lighting (for removal of Vietnam War era Diesel-Generator Powered Zenon Lighting. Prime contractor providing PA System on Indian River Bridge Area for VIP and Tourist Viewing. Electrical and Comm. installation of Strategic Defense Initiative: StarBird and PAVE PAWS at Southeast U.S. Sites.
Technician Cape Canaveral Air Force Station – 1992 to 2012 – Johnson Controls/Computer Sciences Corporation – Base Contractor responsible for maintenance, modifications and contractor oversight of Atlas, EELV, Titan and Delta launch facilities and rendered NASA (Industrial) Area Shuttle Support.
Electrical Engineer Kennedy Space Center – 2013 to Present – URS/Jacobs Engineering – Joined KSC as an engineer in 2013 on ISC Contract in support of infrastructure support at SSPF in support of ISS, transitioned to ESC Contract in support of ML-1 Construction Contractor Support and most recently to TOSC Contract to perform Guidance, Navigation Controls for Ground System Engineering in support of the SLS Program.